Tuesday, August 11, 2009

Bathroom framing is complete

The framing for the basement bathroom is complete! This follows a successful concrete pour that patched the floor after all of the plumbing work. Such a relief to make some solid progress like that.



We poured the concrete on a saturday. Took 17 bags to fill the hole. The bad news, is that I had about 15 bags left. We rented an electric mixer which made the job really easy. The hardest part was hauling the 15 leftover bags upstairs and into the car to take back to the store.



Framing went well, and I gave the nail gun a really good workout. Frame was done this past weekend. Now, need to get the rough electrical to the point where I can get it inspected.

0 comments:

Post a Comment